Pharmaceutical Engineering Articles
Articles published in Pharmaceutical Engineering, ISPE’s bi-monthly member magazine that relate to the
subject matter of the C&Q COP.
- Commissioning, Qualification, and Verification – Lean Approach to
Implementation (
2 MB) 
November/December 2009, 29(6)
By Ms. Sabra Seyer, Dr. Graham Wrigley, Mr. Gert Moelgaard, Mr. Nicholas Andreopoulos
- Applying Quality Risk Management Principles to Achieve a Practical
Verification Strategy (
5 MB) 
November/December 2009, 29(6)
By Mr. Ian Campbell
- Good Weighing Practices for the Pharmaceutical Industry – Risk-Based
Qualification and Life Cycle Management of Weighing Systems (
8 MB) 
November-December 2009, 29(6)
By Dr. Klaus Fritsch
- Integration of Commissioning and Qualification (C&Q) with Other
Phases of the Project Lifecycle (
370 KB) 
May/June 2007, 27(3)
By John Devlin
- Risk-Based Equipment Qualification: A User/Supplier Cooperative
Approach (
599 KB) 
July/August 2007, 27(4)
By Sandro De Caris, Marco Bellentani, Beny Fricano, Carlo Bestetti, Marco Silvestri, Barbara Testoni
- Commissioning and Qualification: A New ASTM Standard – GMP
Regulations (
262 KB) 
November/December 2007, 27(6)
By Robert E. Chew, David Petko
- The Power of Planning and how it Translates to Commissioning
Efforts (
265 KB) 
March/April 2006, 26(2)
By Katie Henchir
- Design Qualification in Practice – from Strategy to Report (
172 KB) 
July/August 200), 25(4)
By Yossi Chvaicer
- A Practical Approach to Commissioning and Qualification - A Symbiotic
Relationship (
310 KB) 
Pharmaceutical Engineering (July/August 2004), 24(4).
By Timothy D Blackburn
- Validation Outsourcing Best Practices: What Does this Mean for the
Client-Contractor Relationship? (
464 KB) 
July/August 2004, 24(4)
By Katie Henchir, Cynthia Ingols
- Commissioning and Time-To-Market (
501 KB) 
July/August 2004, 24(4)
By Wael Allan
- Regulatory Requirements for Computer Infrastructures (
312 KB) 
May/June, 2003, 23(3)
By Orlando Lopez

Indicates content available to ISPE members only.